DesignFlow

CONSTRUCTION SCHEDULING SOFTWARE

Construction Scheduling Software with Built-In Risk Analysis

CPM scheduling, Monte Carlo risk simulation, and DCMA 14-point health checks — the tools professional planners use, connected to your field data and budget.
Most construction schedules are built once and then drift from reality. DesignFlow Build treats the schedule as a living model: build it with CPM, pressure-test it with Monte Carlo and DCMA 14-point checks, run look-ahead and pull planning with the field, and keep it honest with progress that syncs from the jobsite and variance you can actually see.

CPM scheduling and critical path

Build and manage Critical Path Method schedules with Gantt views that make the driving path and float obvious.

  • Critical Path Method (CPM) Gantt

  • Look-ahead scheduling

  • Schedule compression (crashing & fast-tracking)

Schedule risk and health

Quantify uncertainty with Monte Carlo simulation and audit schedule quality with the DCMA 14-point assessment and a schedule health score.

  • Monte Carlo schedule risk simulation

  • DCMA 14-point assessment

  • Schedule health score and variance overlay

Lean planning and resources

Run pull planning (Last Planner System) and resource leveling so the plan reflects how the work will actually be staffed and sequenced.

  • Pull planning (Last Planner System)

  • Resource leveling and histograms

  • What-if scenario analysis

Connected to the field and budget

Progress captured in the field updates the schedule, and earned-schedule metrics tie time performance to cost — so slippage shows up early, with its dollar impact.

  • Earned schedule metrics (SPI-t, SV-t)

  • Weather delay tracking

  • Forensic delay analysis

Frequently asked questions

Critical Path Method (CPM) scheduling with Gantt views, Monte Carlo schedule risk simulation, DCMA 14-point assessment, earned schedule, resource leveling, schedule compression, look-ahead scheduling, and pull planning (Last Planner System).

It is a standardized 14-check audit of schedule quality (logic, leads/lags, float, critical path realism, and more) used by professional planners and government programs. DesignFlow Build runs it automatically so you can find and fix schedule defects before they bite.

Monte Carlo simulation runs the schedule thousands of times with ranged durations to produce a probability distribution of finish dates, so instead of a single optimistic date you get a realistic confidence range and the activities driving the risk.

Yes. Field progress captured on the mobile app updates the schedule, and earned-schedule metrics connect time performance to cost so variance and its dollar impact surface early.

Build a schedule that survives contact with the field

Start free and go live in 2-4 weeks — no rip-and-replace, no army of consultants.