Build and manage Critical Path Method schedules with Gantt views that make the driving path and float obvious.
Critical Path Method (CPM) Gantt
Look-ahead scheduling
Schedule compression (crashing & fast-tracking)
Quantify uncertainty with Monte Carlo simulation and audit schedule quality with the DCMA 14-point assessment and a schedule health score.
Monte Carlo schedule risk simulation
DCMA 14-point assessment
Schedule health score and variance overlay
Run pull planning (Last Planner System) and resource leveling so the plan reflects how the work will actually be staffed and sequenced.
Pull planning (Last Planner System)
Resource leveling and histograms
What-if scenario analysis
Progress captured in the field updates the schedule, and earned-schedule metrics tie time performance to cost — so slippage shows up early, with its dollar impact.
Earned schedule metrics (SPI-t, SV-t)
Weather delay tracking
Forensic delay analysis
It is a standardized 14-check audit of schedule quality (logic, leads/lags, float, critical path realism, and more) used by professional planners and government programs. DesignFlow Build runs it automatically so you can find and fix schedule defects before they bite.
Monte Carlo simulation runs the schedule thousands of times with ranged durations to produce a probability distribution of finish dates, so instead of a single optimistic date you get a realistic confidence range and the activities driving the risk.
Yes. Field progress captured on the mobile app updates the schedule, and earned-schedule metrics connect time performance to cost so variance and its dollar impact surface early.
Start free and go live in 2-4 weeks — no rip-and-replace, no army of consultants.