CONSTRUCTION SCHEDULING SOFTWARE

# Construction Scheduling Software with Built-In Risk Analysis

CPM scheduling, Monte Carlo risk simulation, and DCMA 14-point health checks — the tools professional planners use, connected to your field data and budget.

Most construction schedules are built once and then drift from reality. DesignFlow Build treats the schedule as a living model: build it with CPM, pressure-test it with Monte Carlo and DCMA 14-point checks, run look-ahead and pull planning with the field, and keep it honest with task status from the jobsite and variance you can actually see.

## CPM scheduling and critical path

Build and manage Critical Path Method schedules with Gantt views that make the driving path and float obvious.

- Critical Path Method (CPM) Gantt
- Look-ahead scheduling
- Schedule compression (crashing & fast-tracking)

## Schedule risk and health

Quantify uncertainty with Monte Carlo simulation and audit schedule quality with the DCMA 14-point assessment and a schedule health score.

- Monte Carlo schedule risk simulation
- DCMA 14-point assessment
- Schedule health score and variance overlay

## Lean planning and resources

Run pull planning (Last Planner System) and resource leveling so the plan reflects how the work will actually be staffed and sequenced.

- Pull planning (Last Planner System)
- Resource leveling and histograms
- What-if scenario analysis

## Connected to the field and budget

Crews mark tasks started or complete from the iPhone app, against the same schedule the office uses. Earned-schedule metrics tie time performance to cost — so slippage shows up early, with its dollar impact.

- Earned schedule metrics (SPI-t, SV-t)
- Weather delay tracking
- Forensic delay analysis

## Frequently asked questions

### What scheduling methods does DesignFlow Build support?

Critical Path Method (CPM) scheduling with Gantt views, Monte Carlo schedule risk simulation, DCMA 14-point assessment, earned schedule, resource leveling, schedule compression, look-ahead scheduling, and pull planning (Last Planner System).

### What is a DCMA 14-point assessment?

It is a standardized 14-check audit of schedule quality (logic, leads/lags, float, critical path realism, and more) used by professional planners and government programs. DesignFlow Build runs it automatically so you can find and fix schedule defects before they bite.

### How does Monte Carlo help?

Monte Carlo simulation runs the schedule thousands of times with ranged durations to produce a probability distribution of finish dates, so instead of a single optimistic date you get a realistic confidence range and the activities driving the risk.

### Does the schedule stay current with the field?

Yes. Crews mark tasks started or complete from the iPhone app, against the same schedule the office uses. Earned-schedule metrics connect time performance to cost so variance and its dollar impact surface early.

## Explore more

[Construction Project Management](https://designflow-build.com/construction-project-management) [Construction ERP Software](https://designflow-build.com/construction-erp) [AI Construction Software](https://designflow-build.com/ai-construction-software) [Blog](https://designflow-build.com/blog/)

## Build a schedule that survives contact with the field

Start free and go live in 2-4 weeks — no rip-and-replace, no army of consultants.